Originally, the Jai Hind metro station was planned to generally be elevated. Even so, the AAI objected the elevated stretch up on the airport may possibly pose a menace to aircraft, so the route was more reworked plus the station was shifted underground, 150 m within the Airport terminal setting up. https://ingmaru986dob9.wikiexpression.com/user